Wind Turbines



 

It is not possible to perform AEP of the wind park if WTG type was not selected. Therefore it is very important to select potential producer(s) in early phase of the investment which will provide accurate predictions of AEP and lead to decisions if the wind park will be successful. Besides AEP transportation of the WTG equipment is very important because the WTG type and specifications will determine size of transport packages which is not always accesible to the wind park location. It is very important to negotiate with the producer equipment delivery through transport study.

 